安装须知:导杆、钢丝绳、起吊系统必须保持平行!
Installation Notes:guide rod,steel wire rope,lifting system must remain parallel!
安装须知:导杆、钢丝绳、起吊系统必须保持平行!
Installation Notes:guide rod,steel wire rope,lifting system must remain parallel!
Notes:
1.The special installation systems for the submersible mixers can facilitate the quick installation and dismantling of the submersible mixers under the conditions of no need for draining off sewage from the pond,
2.Installation System I-1 is only suitable for the pond depth<4m and the mixer models of QJB0.85/8 and QJB1.5/6 and with the possibility of adjusting the angles in both the horizontal and longitudinal directions.With the depth >4m,the installation system l-2 shall be chosen.
3.For Installation Systems ll and ll,the guide rod can rotate round the axial line of the guide rod along the horizontal direction with the maximum angle of rotation±60° .
4.With H>4m,it is necessary to add a supporting frame between the guide rods.
5.The supporting frame and the lower support shall be fixed onto the pond wall and the pond bottom with the use of expansion bolts or chemical anchors;any pre-prepared holes can be dispensed with.
6.While placing an order by customer,please supply the pond depth H and the drawing of the pond shape so as to determine the dimensions of the guide rod and the number of the supporting frames.
7.The installation systems may employ the material of stainless steel or carbon steel for the selection of the corrosion- resisting properties.
8.A multiple of mixers can share one lifting system.